Welsh Back
The first site was on Welsh Back, at the harbour. We took it on with more enthusiasm than experience and spent the first six months working out which of the things we thought we knew were actually true. A few were. Most were not.
The first EHO inspection arrived two months in. I made coffee with shaking hands. We got a 4-star. By the second inspection we were a 5-star and stayed there. The thing that changed was not knowing more rules. It was writing down what we were already doing.